- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Garrat Park Primary School
The works consisted of the securing of the area and a full strip out with internal alterations, structural alterations to form new enlarged open plan Kitchen & Canteen Area. The works were planned over some months prior to the School Summer Holidays with the design, approvals and supply of catering equipment being on a long lead time.
We took possession of the site and dealt with the strip out promptly to get back to the shell core to enable our Mechanical layout design to be checked and modelled. The co-ordination of the 1st & 2nd fix services was a key feature of this project and was carried out in-house by our own Mechanical & Electrical Department.
The H.A Marks In-House Mechanical & Electrical team was a key advantage in ensuring that we were able to complete the design and installation and completion of the project on time.
| Attachment | Size |
|---|---|
| Click Here to download full case study | 305.59 KB |