- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Royal Masonic Trust For Girls & Boys- Strip Out Works Great Queen Street-W1
The Royal Masonic Trust for Girls and Boys was established following the amalgamation of two previously separate institutes for Girls and boys. The overall aim of the organisation is to relieve poverty and advance education of children of all ages. The buildings latest use was for office space with a restaurant and shop unit operating out of ground & basement levels and offices ands flats on the upper.
HA Marks were appointed to carry out works on this a listed building, such to include; Protection to listed fixtures and fittings, Internal strip out works to the existing building fabric including isolation and disconnection of existing services, asbestos removal, removal of internal partitions & ceilings, fixtures & fittings. There were 3 tenants, a restaurant and two shop units on the ground floor which were to remain fully functional at all times.
This project posed technical difficulties in that the existing electrical, water and BT data were poorly mapped. These had to be redirected or disconnected & a new separate fire alarm installed to the restaurant. The site was very restricted for space therefore careful co-ordination of deliveries and removal of waste was required while maintaining a high level of public segregation at all times.
Upon completion, HA Marks carried out a structural survey at the clients request and provided suitable propping where necessary. These works were executed successfully through close tenant liaison and involved minimal disruption to businesses below.