- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Heber School
Heber SchoolThe project involved constructing a new entrance area, refurbishment of reception area, refurbishment of classrooms, toilets and new administration office. A steel framed and structural glazed structure now forms the impressive entrance lobby of the school.
An automatic glazed door offers ease of access but security as required. A curved concrete insitu staircase leads from the lobby to the reception area, the stairwell is clad with solid oak flooring and panels, in addition a glazed lift offers access to the reception level.
An oak timber bespoke reception desk was designed and installed other purpose made joinery included oak solid doors, window frames and seating benches. The flooring of the entrance area was a continuation of the external paving into the glazed structure. A matwell provides some cleaning of shoes prior to people walking on the solid oak flooring of the reception area.
New module lighting and fire installation and adaptation was provided to the all refurbished area. The existing heating system was adapted and extended to suit new configuration and new type low level heating was positioned under purpose made seat benches. Key elements of the project was the quality of workmanship, phasing of works to minimise disruption of the school, protection and health and safety of both our workforce, the school children, staff, parents
and other members of the public.
| Attachment | Size |
|---|---|
| Click Here to download full case study | 938.12 KB |