- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Volumetric
Du Cane Housing Association
Volumetric Building ConstructionH A Marks are working in partnership with Powerwall (www.powerwall.co.uk) to install off site manufactured modular units to the roof space of 5 existing blocks and infill between two pairs of blocks. The additional storey and infill will provide 44 new dwellings which have been designed to achieve code for sustainable homes level 3 and the client is aiming to achieve BREEAM ‘ Very Good ‘ rating.
As can be seen in the photos the Volumetric Modular units arrive to site fully fitted out and in weather tight condition. The tyvek layer has been removed from the modular unit in photo 3 for the purposes of photographs as the installation day was dry.
»