- Home
- The Company
- What we do
- Case Study
- Principal Contractor
- Civils
- Commercial
- DDA Work
- Education
- Darwin Building, Regent’s College
- Garrat Park Primary School
- Heber School
- Kelston Religous Education Centre
- Regents College, Regents Park
- Reid Hall, Regent’s College
- Swaffield Primary School
- The Tate Library & Acland Building
- University of East London - Stratford Campus
- University of East London
- Westbridge Primary School
- Health
- Industrial
- Leisure
- Listed Building & Restoration
- Public Works
- Private Residential
- The GAP Site, Hastings
- The Gatehouse, Petersham
- The Sports Pavillion, Dulwich Common
- Whitton Timber, Peckham
- Green Technology
- Volumetric Construction
- Cladding & Facades
- Mechanical & Electrical
- Rail Contractor
- Brixton Station
- Clapham Junction Station
- Commercial Kitchen/Restaurant Fit Out
- Cross Rail - Paddington Central
- Engineering Workshop & Warehouse
- Express Chambers – Edgware Station
- LUL - Sundry Depots
- Lillie Bridge Rail Depot
- London Underground - Calibration Unit
- New Workshops & Storage Units
- Oxford Circus House
- Paddington Integrated Project Works - Crossrail
- Tubelines DSM Offices - Fit Out & Alterations
- Victoria Station - Terminus Place
- Façade Restorations
- Maintenance & Call Out
- Principal Contractor
- Accreditations
- Sectors
- News
Transport and Rail
Paddington Integrated Project Works - Crossrail
Paddington StationTo strip out the Old Storage Rooms and carry out the relocation of the Staorage Rooms for the Paddington Station Retail Units.
Demolition and Removal of existing walls and to open up the areas to improve storage facilities. Fit Out and Redecoration Works, New Safety Flooring with Damp Proofing (Everlay system).
Alterations to existing Electrical Installation and installation of new Fire Alarm System. The majority of the works were programmed during out of hours and the project was completed on Time and on Budget.
| Attachment | Size |
|---|---|
| Click Here for full case study | 428 KB |
Honiton Station
The waiting room, Ticket Hall and Administration offices at Honiton Station were partially demolished and cleared.
During the works a temporary Ticket Hall, Waiting Room and Staff Areas were provided to enable the continued operations of the station.
The main Steel Frame and Roof of the Ticket Hall was maintained whilst the rest of the areas were stripped out and demolished.
H.A Marks constructed a New Build Extension to the Station to include services, new Metsec Framing to Walls & Ceilings, new Toilet Areas and New Staff Acommodation.
We carried out a full re-fit/refurbishment to the other areas to include new Mechanical & Electrical Services. A large scale DDA Ramp was constructed to the front of the station.
The project was a great success and the works were finished on time and on budget with minimal disruption to the Stations operations.
| Attachment | Size |
|---|---|
| Click Here to download a full case study | 3.5MB |